Two documents, wiki-style so they import cleanly: short titled sections,
tables over prose where the content is comparative, and cross-references
between sections rather than a narrative that has to be read start to end.
MicrOBU-User-Guide.docx is for riders. Features, setup for both hardware
paths, what each screen shows, what the five alerts mean in plain language,
troubleshooting. No ASN.1, no BTP ports, no bit widths anywhere in it. The
alert descriptions and the link states are taken from values/strings.xml so
the guide and the interface use the same words.
MicrOBU-Technical-Documentation.docx is for supervisors and stakeholders.
Architecture, the message path end to end, the serial protocol, the codecs
and how they are verified, the full requirements matrix, the bench results,
and the decisions. Section 15 is fourteen decisions written as chosen /
alternative / reasoning / cost accepted, because the alternative is the part
a supervisor asks about and it was previously recorded only in commit
messages.
Nothing is re-derived. Every measurement is cited from
05-obu-bench-test-2026-08-25.md, 04-transmit-setup.md, asn1/README.md or
the commit history. Where a claim has no evidence it is marked as unverified
rather than asserted:
- 11.6 Phase A success criteria is stated as not met, in its own subsection.
The bench proves reception; it cannot prove the use case with two moving
stations because nothing on the bench moves. This is the central claim of
the project and it needs a real ride.
- The tx_custom.c bypass is described as the least defensible component in
the system and load bearing, with the reverse-engineered struct layouts
and the skipped sanity checking spelled out.
- The 5900 MHz transmit story is marked a mitigation for a hypothesis, not a
diagnosis, and the isolation test that would settle it is named as not run.
- The detection thresholds are presented as untuned engineering estimates in
both documents, since presenting them as validated is the easiest and most
damaging overstatement available here.
Twenty image placeholders, none of them filled. Each is a shaded block
carrying a caption and a "Must show" line. For the three screenshots that
exist the line names the bench session and section they came from; for the
four diagrams that do not exist yet it is a full drawing spec, so the two
hardware paths, the message path, the frame layout and the verification loop
can be drawn from the document without re-reading the source.
references.bib collects the standards as BibTeX for a later publication:
EN 302 637-2/3, TS 103 301, SAE J2735, TS 102 894-2, EN 302 636-4-1 and
-5-1, TS 103 248, TS 103 097, IEEE 802.11 OCB, plus the C2C-CC white paper
and the vendored parser provenance.
Also tracks two documents the new ones cite that had never been committed:
docs/01-requirements-traceability.md and 04-transmit-setup.md. Section 18.3
lists them as repository sources, which would have been a dangling reference
otherwise.
Not included, deliberately: the two consider it PDFs cited in section 18.2.
They are third-party vendor documentation and redistributing them is a
licensing decision, not a documentation one.
Still missing: the German user guide. values-de/strings.xml already fixes the
terminology for it.
Co-Authored-By: Claude Opus 5 <noreply@anthropic.com>